Picture of the cabin exterior "before". Note the dark stain and how it covers the chinking?
About a month ago we started the process of doing some rennovations on the cabin. A few years ago we hired someone to apply a coat of stain to the exterior of the cabin. We were in New Jersey at the time, so he did the work unsupervised. Our hearts dropped when we first saw it. He had used a very dark non-transparent stain and applied it in a way that it covered the chinking. The beauty of a rustic log cabin was lost to this big brown blob.
The "back" of the cabin. Note the hail damage to some of the lower logs. We were able to get our insurance company to pay for part of the restoration because of the damage.
In addition to rejuvinating the cabin exterior, we also wanted to enlarge the entry deck on the "back" of the cabin and add a fenced-in area for the dogs.
Now when I say "back" of the cabin, that is somewhat ambiguous and others call it the "front". It is the side of the cabin where we have parking and access to the outbuildings, but it is also technically (according to the cabin plans) the back. The front--to me--is the north-facing side with the screened-in porch. Anyway, this ambiguity causes lots of communications problems.
A few years ago, our entry gate blew down. It was two large posts with a cross-piece at the top. The posts rotted at the bottom and the wind blew it over. So, while doing the fencing, we also wanted to create a new and appealing entry.
Here are the "after" photos. Read on for the "in-between" story:
The cabin restored to its original beauty.
Note the new larger deck as well as a fenced-in yard where the dogs can play unsupervised.
The cabin restoration was about a three week process. The crew arrived on May 12th and worked through the 17th. During that time they were able to sand-blast the exterior of the cabin, getting rid of the old stain and then sand the logs down in preparation for three new coats of stain.
You can see the contrast between the old and the new in this photo.
However, the weather forecast was for a huge snowstorm. And, while the crew is accustomed to working in harsh conditions, there would be no way for them to shuttle to town and back each day. And, we could not host a crew of five workers for several days. So, on Wednesday the 17th, they took off for their own homes (most live in the mountains of central Colorado).
And, sure enough we got snow.
In total, we got about 3 feet of snow over two days.
The crew returned on Tuesday the 23rd and started back to work. There was still some snow on the ground, but they were able to work around that.
Ready for new stain and chinking.
On the same day the crew came back to work on the cabin, another crew showed up to build the deck, put up the fencing and gates, and also build a new entry feature for the driveway. While the snow had melted rapidly over the weekend, there was still some snow that had to be moved in order to do the entry and fencing. Luckily, the crew had a skid steer with a bucket as well as augers to make easy work of that.
A 24" auger was used to drill a huge hole for the two vertical posts at the entry.
Up go the entry gate posts.
An early morning shot of the fenced in yard. It is kind of hard to see in this light, but we'll post additional photos soon.
Since we had a crew of pro stainers on site, we had them stain the barn, too. Now we just need to paint the trim. It will be the same dark green color as trim elsewhere around the cabin.